Rock mass repair material - メーカー・企業と製品の一覧

Rock mass repair materialの製品一覧

1~2 件を表示 / 全 2 件

表示件数

Construction Achievements: H30 Kyoto City, Kyoto Prefecture

Integrating floating stones with the bedrock to prevent rockfalls in advance! Introducing our achievements in Kyoto City, Kyoto Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high effectiveness in preventing falling rocks. 【Construction Achievements】 ■Project Number: 3563 ■Client: Kyoto Prefectural Forestry Office ■Main Contractor: Sanwa Construction Co., Ltd. ■Project Name: FY 2017 Erosion Control Project (Emergency Erosion Prevention) (National Treasury Debt Obligation) ■Prefecture: Kyoto Prefecture ■Construction Location: Kurama Honmachi, Sakyo Ward, Kyoto City ■Construction Start: June 2018 ■Construction End: August 2018 *For more details, please refer to the PDF document or feel free to contact us.

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Construction Achievements: H30 Okayama Prefecture Kamisaibara

Applicable to giant rocks and high-altitude rocks! Introducing the achievements in Kamisaibara, Okayama Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes cracks and openings to prevent loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Achievements】 ■ Project Number: 3579 ■ Client: Okayama Prefectural Mimasaka Bureau of Construction ■ General Contractor: Nakaniishi Kogyo Co., Ltd. ■ Project Name: 52-18-52 2-18-1 Public Road Construction (Slope Work) ■ Prefecture: Okayama ■ Construction Location: Kamisaihara, Kagamino Town, Tomata County ■ Construction Start Date: September 2018 ■ Construction End Date: November 2018 *For more details, please refer to the PDF document or feel free to contact us.

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録